Nigeria Commercial Complex Energy Storage Project (Diesel Reduction Solution)
2026-05-28
Project Name: Nigeria Lagos Commercial Complex Energy Storage Project

Project Overview:
Located in Lagos, Nigeria, this project serves a large commercial complex previously powered mainly by diesel generators. A 500kW/1MWh containerized BESS was installed to reduce diesel consumption and improve energy efficiency.
Why the Client Chose Us:
l Strong experience in hybrid energy systems (BESS + diesel generators)
l Competitive pricing with high reliability
l Extensive project experience in African markets

Project Execution:
We designed a hybrid control strategy where the BESS supplies power during low-load periods, while diesel generators support peak loads.
Challenges & Solutions:
Challenge 1: Unstable coordination between diesel generators and BESS
→ Solution: Optimized PCS control logic for seamless switchin
Challenge 2: Limited on-site construction conditions
→ Solution: Pre-installed containerized system to minimize site work

Delivery & Operation:
The system was installed and commissioned within 20 days, significantly reducing diesel generator usage.
Post-Delivery Support:
The client required operational training, which we provided through remote guidance and technical support.

Client Feedback:
Diesel consumption has been reduced by approximately 40%, along with lower noise levels and improved environment.
Project Status:
The system is running reliably, and the client is considering replication across other commercial sites.
-
Kulinda Ugavi wa Nishati ya Makazi: Mradi wa Uhifadhi wa Nishati wa N'Djamena Nje ya Grid Microgrid2026-04-13
-
Kuwezesha Uzalishaji Sifuri: Mradi wa Kupuliza Filamu ya Bamako Off-grid Energy Retrofit Retrofit2026-04-13
-
Kuanzisha Ugavi Imara wa Kiwandani: Mradi wa Hifadhi ya Nishati ya Umeme wa Juu wa Kiwanda cha Mali2026-04-13





Simu